1. Bonifas
Renovate PX (Straighten side walls,
install walk-in, replace old fixtures with standardized AAFES
fixtures, replace ceiling/floor tiles and lighting fixtures)
2.
Casey
a) Open Charley's Steakery in May or
June 2000.
b) Construct Butler building for 702d Maintenance
PX.
c) Relocate 1st Brigade PX into strip mall that is being
constructed.
d) Renovate Bookmark/Video Rental (Replace floor/ceiling
tiles.
e) Renovate Sports Store (Replace old fixtures with
standardized AAFES fixtures, lighting fixtures and
ceiling/floor tiles)
f) Renovate Dragon Valley PX (Install walk-in, replace
fixtures, lights and ceiling/floor tiles
3. Castle
(no facility
projects at this
time)
4. Essayons
Renovate PX (Install walk-in, replace
fixtures, lights and ceiling/floor tiles)
|
5. Falling Water
(no facility
projects at this
time)
6. Hovey
MCSS, Class Six and Concession
Mall will be moved into the strip mall that is being
constructed
7. Jackson
Install walk-in in the PX
8. Kyle
Renovate the PX (Install walk-in,
replace fixtures, lights, and ceiling/floor tiles)
9. Sears
Renovate the PX (Install walk-in, replace
fixtures, lights and ceiling/floor tiles)
10. Mobile
(no facility
projects at this
time)
|
11. KTC
(no facility
projects at this
time)
12. Nimble
(no facility
projects at this
time)
13. Stanley
a) Construct mall to house PX, MCSS, Burger Bar
and concessions under the same roof.
b) Renovate Aviation PX (Install walk-in, replace fixtures
lights and ceiling/floor tiles)
14.
Red
Cloud
(no facility
projects at this
time)
|