
|
Image upgrade of the Randolph AFB Exchange Mall began in late October and was completed in January 2005. Primary intention of this project was to bring each of the concession operations in line with the (Post 04) AAFES Services Design Standards and included new flooring, wall covering, lighting, interior sign kits, and exterior mall signing. This renovation also added a new dropped ceiling and additional lighting in the common area of the Mall and covered exposed electrical and communication lines. As you can see we have a lot of positive changes going on throughout the base to better serve the needs of our customers.
updated: 03/03/05 |